For lighting, we lit the outside of the church as well as the inside. For the outside, we provided (10) ETC S4WRD, all with EDLT lenses. These were mounted on (3) sticks of 8ft truss, which in turn were supported by Mobiltech ALP-5 crank-up stands. Furthermore we provided pipe and base and (8) 25lb sand-bags to keep everything safe. We added (24) Colorblast TRX as well. We rolled all the Dual50 and edison cabling we needed and the outside was ready.
For lighting inside, we provided (8) ETC Lustr Series 2, again with EDLT lenses, to create a wash across the entire ceiling of the church. All were mounted on Impact Turtle Base C-Stands and connected with all DMX cabling needed. We set-up (6) ETC S4WRD to light te tomb of Father Hecker, as well as the stage, and we were all set to jump into video world.
For video, began with the Production Bot Switch 8. Heading to the displays were a number of videos, slideshows, and camera feeds. For cameras we provided (3) Panasonic PX-270s, one of which was handheld outside the church to reveal the new lighting we were providing. For displays, we provided (2) 80-inch Sharp Aquos TVs and (2) 70-inch Sharp Aquos Quatron TVs, all on Premier Mounts stands.
To route all content to the screens we put in line (1) ATEM 2 M/E, giving us access to six separate auxiliary outputs. To feed the Atem we rigged up (2) Macbook Pro 15", running a combination of Playback Pro and PowerPoint, alongside the Production Bot Switch 8.
For audio, we began with (1) Yamaha QL-1 and (4) L'Acoustics 108P., all on Ultimate Support Tripods. For microphones we provided (2) Shure MX418 podium mics, as well as (2) Shure UR2 handheld mics paired with Shure UR4D receivers.
With all that done, we set up (3) 8x4 sections of stage. skirted it, and we were ready to get the show on the road!
Kindly take a look at our photos from the event below: