Showing posts with label L'Acoustics 8XTi. Show all posts
Showing posts with label L'Acoustics 8XTi. Show all posts

Saturday, March 23, 2024

03.23.24 - Student Fashion Show at St. Mark's Church in the Bowery

 The Moore PA Hire team went to St. Mark's in the Bowery for the Parsons School of Design student fashion show to provide audio, lighting, and video equipment and services.  Let's begin.

For audio, we began with (1) Yamaha QL1 and (1) ULXD-G50 providing us with 4 channels of digital audio.  Additionally, we used (2) ULXD2 handheld mics.  For speakers, we used (8) L'Acoustics X8 and (1) L'Acoustics dV Sub.

For lighting, we provided (10) ETC Lustr S2 and (10) ETC Source 4, as well as all the necessary components and cabling.  Controlling the lights were (1) ASUS Laptop with grandMA2 and (1) MA Command Wing.

For video, we provided (1) Optoma 8K Laser Projector and (1) Roland VR-50HD to display and serve content.  

Please check out some photos of the event below:













Tuesday, June 25, 2019

06.25.2019 - Arcadium @ Hudson Yards

On June 25th Moore PA Hire loaded into a brand new space in Hudson Yards to provide audio, video, and power distribution equipment and services for a pop-up brand space called Arcadium. Let's get going.

For audio, we began with (1) Mackie DL1608 and our L'Acoustic LA-8 amp rack. For speakers we provided (10) L'Acoustics 8XTi, cabled up with as much NL4 cable as needed. The pop-up was active for 10 days, but on some specific nights we provided additional audio equipment, as follows. We provided (1) Pioneer CDJ 2000 Nxs, Rane SL4 Serato Scratch Live, and our Shure UR4D rack paired with (3) Shure UR2 Handheld microphones. We also provided (2) L'Acoustics 108P, and (1) mic stand as needed throughout the activation.
For video we provided (1) LG UK6300PUE 50" display and (1) Samsung RU7100 43" HDR 4K display.
For power distribution we rolled in with (1) Motion Labs ETL 400amp distro., our camlock tie-in set, (2) 50amp GFCI Spider Boxes, along with all edison and soccapex cable needed. We laid down our 3ft ADA compliant cable ramp and we were good to go!

Kindly take a look at our photos from the event below: